Step 7 – Finishing and Stockpiling PDF  | Print |  E-mail

Prior to delivery to the stock area, all product is assessed for quality, and compliance with AS/NZS 4058:2007 Precast Concrete Pipes (or client specifications). Production and testing procedures are carried out in accordance with RCPA accredited Quality Management Systems i.e. to ISO 9001:2008.

 

Finishing and Stockpiling

Reinforced concrete pipe stockpiling

Downloadable information

Terms of contract Queensland
(pdf160k )

Terms of contract Victoria
(pdf164k )

Terms of contract WA
(pdf160k ).

Disclaimer

The information held throughout this website has been prepared with all reasonable care and thought, however RCPA and its related companies and agents do not warrant the accuracy of any information shown and do not accept any liability for negligence, any error or discrepancy or otherwise in the items shown.

RCPA Benefits

Our advanced process is approximately 4 times faster than traditional methods, reducing delivery times and delays.

There is very little waste, very little water used and recycling takes care of the rest.

 

 

Contact Us

QLD Ph: (07) 3804 6266

VIC Ph: (03) 9746 0600


W.A. Ph: (08) 9434 4055